|

| |
Improve Reliability of Older Plants
Improve Power System Reliability In Older Industrial Plants.... Our
experienced engineers can perform a "System Audit and Analysis" that meets the
requirements of your facility:
-
Equipment and Substation Audit
-
Documentation of Equipment and System
Operating Conditions
-
Updating One Line Diagrams
-
Load and Harmonic Audit
-
Power Factor and Harmonic Analysis
-
Short Circuit, Coordination, and Arc Flash
Analysis
-
Develop A Plan With.... Specific
Recommendations
Older plants are a challenge...They are our SPECIALTY at Qual-Tech
FOR INDUSTRIAL PLANTS OVER 20 YEARS OLD, OFTEN...
-
The system was designed to standards and codes
that may be out of date.
-
There are many different types of equipment.
-
There is equipment from many different
manufacturers.
-
System and equipment documentation is either
incomplete or nonexistent.
-
One-line diagrams are either badly out-of-date
or nonexistent.
-
Less reliable analog trip devices are in use
instead of modern static trip devices.
-
Consideration is given to replacing aging
switchgear.
-
Equipment short circuit ratings may be
inadequate.
-
Equipment maintenance is lacking.
-
When a breaker trips or a process misoperates,
it is difficult to identify the source of the problem.
|